Improvements to the Balzac interchange at Highway 2 and Highway 566 is not currently part of the three-year Provincial Construction Program. A long term planning study was undertaken by Alberta Transportation to identify the ultimate requirements for the Balzac interchange, as part of the Highway 2 Corridor Improvement Study. A detailed design for the interchange has been completed, and will be added on to the Provincial Construction Program as funding becomes available. Read the letter from Brian Mason, Minster of Alberta Infrastructure Transportation, to Chestermere MLA, Leela Sharon Aheer, here.
Balzac Interchange Upgrade Not Planned
